Proven iBB System Success in the Field

iBB Systems Deployed Successfully in Italy and China

IT Iraci Borgia Farm

Perugia, Italy
  • 1 MW biogas-to-power plant
  • Digester System: Twin CSTRs (Continuous Stirred-Tank Reactors) plus post-digester reactor
  • Feedstock: Dairy by-products & winery/ag waste
  • See footnote 1, below
>30%
Methane Capture per unit of feedstock

CN Hubei Jian Feng Pig Farm

Huangshi, China
  • Evaluating 1.4 MW biogas potential
  • Digester System: Single Horizontal Plug-Flow Digester
  • Feedstock: Swine manure & slaughterhouse waste
>40%
Methane Capture Over Baseline

CN Cassava-to-Alcohol Distillery

Jiangsu Province, China
  • Single 5,000m³ tank digester
  • Digester System: Inter-circulation (IC) digester
  • Feedstock: Distillery wastewater
  • See footnote 2, below
>25%
Methane Capture Over Average of 19 Identical Digesters at Facility

IT Biogas-to-Power Plants

Ravenna & Campiano, Italy
  • 1 MW biogas-to-power plants
  • Digester System: Primary CSTR Digester + Post-Digester
  • Feedstock: Corn silage, beets, & other ag waste
>25%
Methane Capture Over Baseline

1 – Independent performance verification conducted at the Center for Biomass Research, University of Perugia

2 – Independent verification: Technical paper available (Abstract link: https://www.sciencedirect.com/science/article/pii/S0301479721024464?via%3Dihub)