Seamless Integration with Existing Digesters


Rapid modular installation with minimal operational disruption.

iBB System installed at an energy crop / organic waste digester feeding a 1 MW generator in Italy.

Designed for Practical Installation

iBB Systems are engineered to integrate into existing anaerobic digestion facilities with minimal disruption to ongoing operations.

Application-Specific Engineering

  • Application-specific design optimized through analysis of feedstock, digestate, biogas, and historical performance data.

Compact Modular Delivery

  • Delivered in one or two container-sized modules depending on host-system requirements.

Simple Physical Connections

  • Requires only small-diameter pipe connections to withdraw samples and return enriched material to the system.

Rapid Deployment

  • Installation, testing, and commissioning typically completed within 6-8 weeks of on-site arrival.
  • Designed to integrate without significant civil works or material digester downtime.