Seamless Integration with Existing Digesters
Rapid modular installation with minimal operational disruption.
iBB System installed at an energy crop / organic waste digester feeding a 1 MW generator in Italy.
Designed for Practical Installation
iBB Systems are engineered to integrate into existing anaerobic digestion facilities with minimal disruption to ongoing operations.
Application-Specific Engineering
- Application-specific design optimized through analysis of feedstock, digestate, biogas, and historical performance data.
Compact Modular Delivery
- Delivered in one or two container-sized modules depending on host-system requirements.
Simple Physical Connections
- Requires only small-diameter pipe connections to withdraw samples and return enriched material to the system.
Rapid Deployment
- Installation, testing, and commissioning typically completed within 6-8 weeks of on-site arrival.
- Designed to integrate without significant civil works or material digester downtime.